Monday, February 25, 2008

Problems of TRP2 submitted to JKP Zon 19

Subsequent to the meeting by JKP Zon 19 on 18/2/08 at MCA building, a report with the details of all problems highlighted in our earlier blog dated 20/2/08, has been submitted officially by hand to Mr Jeffery Choong, pengerusi JKP Zon 19, for the arrangement of the necessary repair or works to be carried out as soon as possible.

Submitted by Ong Siew Hong

Dialog pertaining to Blasting Issue

Subsequent to a letter of complaint pertaining to blasting issue which has brought to the discomfort and anger of the residents of Taman Rawang Perdana 2 being sent to the various government agencies.

En. Nurul Huda B. Romli, Timbalan Pengarah JMG (Jabatan Mineral & Geosains) responded and suggested a dialog be held this Thursday, 28/2/08.

Unfortunately, with the election campaign going on, representatives from the local authorities as well as all meeting rooms are booked for the election campaign.

Mr Jeffery Choong, ahli MPS, pembantu khas YB Dato Tang See Hang suggested that the dialog be postponed and that he could make the necessary arrangement for the next meeting to be scheduled soon after the election.

Therefore, the meeting on Thursday, 28/2/08 has been cancelled.


Prepared by Ong Siew Hong, 25/2/08
www.homebasedbusinessforlife.com/diabetes/
www.homebasedbusienssforlife.com/healthyforlife/

Thursday, February 21, 2008

Antara Masalah-Masalah Taman Rawang Perdana 2


Pagar besi disepanjang jalan utama dari TRP2 turun ke Taman Bukit Rawang Jaya telah berkarat. Pihak JKP Zon 19 atau MPS telah diminta memperbaikki dan mengecat semula pagar besi ini sebelum ia dirobohkan sebagai besi buruk. Longkang di seluruh TRP2 yang tidak pernah dibersihkan termasuk longkang di lorong belakang rumah (laporan dari En. Chan).



Rumah kosong dan stesyen TNB (RP10/6) yang bersemak yang mungkin menjadi tempat pembiakan ular. Tuan rumah-rumah ini (21 RP10/4, 75 RP10/8, 24 RP11/5, 10 RP11/7, 26 RP11/7, 27 RP11/7, 3 RP11/8, No.4 RP11/8) adalah dinasihatkan supaya membuat sesuatu sebelum pihak Majlis Perbandaran Selayang mengambil tindakan.



Tiada perhentian bas yang disediakan di Taman Rawang Perdana 2. Gambar ini menunjukkan kedudukan dimana penduduk TRP2 menunggu bas dan cadangan untuk membina perhentian bas di kedudukan di atas akan dikemukakan kepada JKP Zon 19 sekali lagi.





Tiada tanda jalan ke RP10, RP11, RP12 dan RP13, Taman Rawang Perdana 2 di persimpangan jalan utama di atas, iaitu dari Pekan Baru Rawang, dari Taman Rawang Perdana 1 & dari Taman Bukit Rawang Jaya.



Jalan dan lampu yang rosak di jalan RP10/1 dan RP10, papan tanda jalan RP10/1 yang patah, dan jalan utama berhampiran dengan rumah banglo yang rosak.

MASALAH LAMPU JALAN YANG TIDAK BERFUNGSI
Lampu jalan di simpang jalan utama dari Pekan Baru dan dari rumah En. Jeffery Choong masuk ke TRP2, bersama-sama dengan tiga lagi lampu jalan yang berhampiran dengannya telah lama tidak berfungsi. Lampu jalan yang tidak berfungsi ini juga telah ditutup oleh pokok yang besar dan tinggi ;
RP10 - laporan dari En. Ricky (RP10)
a) Lampu jalan tiang konkrit TNB di hadapan rumah no.1 Jln RP10/5, no.40 Jln RP10/6, no.42 & 96 Jln RP10/7 dan no.35 Jln RP10/9 ;

b) 5 lampu jalan tiang besi (MPS) di sepanjang jalan belakang penghujung Jln RP10/5, 10/6, 10/7, 10/8 dan 10/9 dan

c) En. Ricky juga telah memohon 1 lampu jalan baru di pasang di hadapan rumah no.74 Jln ?

RP11 - laporan dari En. Vicky (RP11)
a) Lampu jalan di hadapan rumah-rumah berikut tidak berfungsi, iaitu 1 RP11/1, 1 RP11/2, 38 RP11/2, 2 RP11/5 (tepi dan depan), 1 RP11/6 (tepi), 2 RP11/7 (tepi) dan 1 RP11/8 l
b) Kesemua (5) lampu jalan di sepanjang jalan cerun naik ke atas kuari Sunwaymas dan Minetech di RP11.

RP12 - laporan dari En. Ruby (RP12) :
a) Hanya 2 daripada 9 lampu jalan dari simpang T RP12 ke flat yang berfungsi dan

b) Ketiga-tiga lampu jalan di sepanjang jalan utama dari RP12 ke Taman Bukit Rawang Jaya (yang berhampiran dengan RP12) juga tidak berfungsi ;

RP13 - laporan dari En. Ruby (RP12) :
a) Hanya 2 daripada 7 lampu jalan di depan kedai rumah yang berfungsi.
Akhir sekali, tangki air berhampiran dengan rumah-rumah semi-D yang menjadi sumber bekalan air ke fasa RP10 dan lain-lain yang tidak ditutup. Air yang dibekalkan ke kawasan berhampiran akan tercemar dan membawa masalah kesihatan kepada penduduk persekitaran.



Disediakan oleh : Pn Ong Siew Hong, Tel : 019-2639086



Tuesday, February 19, 2008

Mesyuarat pertama JKP Zon 19, tahun 2008

Satu mesyuarat JKP Zon 19 yang dipengerusii oleh En. Jeffery Choong Kong Yoong telah diadakan pada 18/2/08, jam 8.30 malam, di Tkt 3, Bangunan MCA, Caw. Rawang.

Perkara-perkara yang perlu diambil tindakan telah dihuraikan di bawah dan satu laporan perlu dikemukakan kepada Pengerusi untuk tindakan lanjut.

A) Menyemak semula perkembangan masalah-masalah yang dibangkitkan oleh En. Rohimi dalam minit mesyuarat lepas seperti berikut :

4.2.1 – TNB Substation No.4, rumput panjang, longkang tersumbat, pintu terbuka dan pagar tidak berkunci ;

4.2.2 – Tiang lampu yang rosak di Jalan RP10, RP11

4.2.3 – Memohon papan tanda menuju ke Rawang Perdana 2 ;

4.2.4 – Papan tanda nama Jalan RP10, RP11, RP12, dan RP13 hilang ?

4.2.5 – Lampu jalan di seluruh kawasan RP12 berfungsi tidak mengikut masa yang sepatutnya ;

4.2.6 – Rumah-rumah terbiar dan semak dan masalah anai-anai di No.3 Jln RP11/8, No.1 Jln RP12/1 dan No.14 Jln RP10/2.

B) Diantara masalah baru yang dibangkitkan dalam mesyuarat tersebut termasuklah :

i) Menyemak semula semua tiang lampu di seluruh kawasan perumahan Taman Rawang Perdana 2 untuk mengenal pasti, lampu tiang yang tidak berfungsi untuk diperbaikki ;

ii) Tiang lampu di simpang jalan utama masuk ke Taman Rawang Perdana 2 (berdekatan dengan unit-unit banglo) yang telah lama tidak berfungsi telah dilaporkan untuk tindakan ;

iii) Tangki air berdekatan dengan semi-D yang membekalkan air ke RP10 dan fasa-fasa yang lain tidak ditutup dengan baik dan ini akan menimbulkan masalah pencemaran air ;

iv) Pagar besi di sepanjang jalan utama turun dari Taman Rawang Perdana 2 ke Taman Bukit Rawang Jaya didapati telah berkarat. Pihak JKP atau MPS diminta mengecat semula pagar-pagar besi ini ;

v) Masalah letupan batu yang kuat yang dilakukan berturut-turut telah menimbulkan perasaan ketidak puas hati penduduk persekiratan.

vi) Apa-apa masalah lain yang perlu dilaporkan ;


AJK Penduduk TRP2 dari kumpulan persekitaran (Environment) digesa membuat semakan masalah-masalah berbangkit dan menyediakan laporan secepat mungkin sebelum peruntukkan JKP Zon 19 untuk tahun 2008 yang berjumlah RM50,000 habis digunakan di kawasan lain.

Sekian, terima kasih.

Disediakan oleh Pn Ong Siew Hong
Tel : 019-263 9086
E-mail : shong.ong@gmail.com

Monday, February 18, 2008

JKP Zon 19, Majlis Perbandaran Selayang


Memperkenalkan Jawatankuasa JKP Zon 19, Majlis Perbandaran Selayang

JKP Zon 19 merupakan satu jawatankuasa yang ditubuhkan di bawah Majlis Perbandaran Selayang. JKP Zon 19 terdiri daripada 11 kawasan perumahan termasuklah Taman Rawang Perdana 2, Taman Rawang Perdana, Taman Bukit Rawang Jaya, Pekan Baru Rawang, Kampung Kenanga, Kampung Sungei Terentang dll.

Tugas utama jawatankuasa ini ialah untuk menyelesaikan masalah infra struktur di kawasan perumahan ini seperti masalah longkang, lampu jalan, sampah, rumput dan sebagainya dengan peruntukkan yang diberikan oleh Majlis Perbandaran Selayang.

Peruntukkan JKP Zon 19 untuk tahun 2008 ialah RM50,000.- saja.

JKP Zon 19 dipengerusii oleh En. Jeffery Choong Kong Yong dan En. Lee Li Yew pula menjadi penasihat JKP Zon 19.


Taman Rawang Perdana 2 diwakili oleh Puan Ong Siew Hong dari RP11 (Tel : 019-2639086) dan En. Rohimi Yusoff dari RP12 (Tel 016-2272722)

Sekiranya terdapat masalah-masalah infra struktur atau kemudahan awam di kawasan anda yang perlu diperbaikki, sila memaklumkan kepada wakil di atas melalui surat atau sms atau e-mel kepada shong.ong@gmail.com untuk dilaporkan kepada jawatankuasa tersebut.

Sekian, Terima kasih.


Disediakan oleh Pn Ong Siew Hong
Tel : 019-263 9086
E-mail : shong.ong@gmail.com